EURAKEM

19 rue Véga

44470 Carquefou-France

phone: +33.(0)2.40.52.69.65

fax: +33.(0)2.40.93.79.97

mail: info@eurakem.com

Heat Recovery Units REMIXCO TM

Site: LNG terminal of ZEEBRUGGE

Society: SUEZ

Country: Belgium

Unit: - ø 7,4 m
  - height 20 m
  - SS 316L

Technical data:

- Behind a 40 MW Gas turbine LM 6000 dry low Nox Energy contained in exhaust gases: 80 MW

- COGENERATION LNG recovers its gaseous phase by the warm water produced by Remixco

 

 

hjhjhhFuel-oil viscometry control ddssgdfsdddddddddddPre-lub oil module

gh 100 m3 Sulfuric acid storage tank ghffgaseous atmosphere monitoring (100 bar)


chemical injection skid
316 L stainless steel

 

index~~skills~~Process units~~Kempro internals~~Projects~~Other departments~~Contact~~site maps